Fatty Bird on Windows Pc
Developed By: Ready Square
License: Free
Rating: 3,1/5 - 545 votes
Last Updated: July 31, 2026
Compatible with Windows 10/11 PC & Laptop
Game Details
| Version | 1.0.4 |
| Size | 16.2 MB |
| Release Date | March 13, 17 |
| Category | Arcade Games |
|
Game Permissions: |
|
|
What's New: |
|
|
Description from Developer: |
|
Game preview ([see all 4 screenshots])
About this game
On this page you can download Fatty Bird and play on Windows PC. Fatty Bird is free Arcade game, developed by Ready Square. Latest version of Fatty Bird is 1.0.4, was released on 2017-03-13 (updated on 2026-07-31). Estimated number of the downloads is more than 10,000. Overall rating of Fatty Bird is 3,1. Generally most of the top apps on Android Store have rating of 4+. This game had been rated by 545 users, 186 users had rated it 5*, 206 users had rated it 1*.How to play Fatty Bird on Windows?
Instruction on how to play Fatty Bird on Windows 10 Windows 11 PC & Laptop
In this post, I am going to show you how to install Fatty Bird on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...
Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.
[Note] You can also download older versions of this game on bottom of this page.
Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.
If this doesn't work on your PC, or you cannot install, comment here and we will help you!
Step By Step Guide To Play Fatty Bird using BlueStacks
- Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
- Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
- Once installed, click "Fatty Bird" icon on the home screen to start playing, it'll work like a charm :D
[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more
[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.
How to play Fatty Bird on Windows PC using NoxPlayer
- Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
- Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
- The installation process will take place quickly. After successful installation, you can find "Fatty Bird" on the home screen of NoxPlayer, just click to open it.
Download older versions
Other versions available: 1.0.4.