Home  /  Travel & Local Apps  / EF Tours for Girl Scouts POST on Windows Pc

EF Tours for Girl Scouts POST on Windows Pc

Developed By: EF Education First

License: Free

Rating: 3,5/5 - 4 votes

Last Updated: July 06, 2019

App Details

Version 1.0
Size 8.9 MB
Release Date May 01, 14
Category Travel & Local Apps

App Permissions:
Required to be able to access the camera device. [see more (11)]

Download on Windows PC

Compatible with Windows 7/8/10 Pc & Laptop

Download on Android

Compatible with Android 4.0+ (Ice Cream Sandwich)

App preview ([see all 6 screenshots])

App preview

About this app

On this page you can download EF Tours for Girl Scouts POST and install on Windows PC. EF Tours for Girl Scouts POST is free Travel & Local app, developed by EF Education First. Latest version of EF Tours for Girl Scouts POST is 1.0, was released on 2014-05-01 (updated on 2019-07-06). Estimated number of the downloads is more than 100. Overall rating of EF Tours for Girl Scouts POST is 3,5. Generally most of the top apps on Android Store have rating of 4+. This app had been rated by 4 users, 1 users had rated it 5*, 1 users had rated it 1*.

EF Tours for Girl Scouts POST allows you to create and send a postcard from anywhere in the world. Just choose a photo from your mobile device (or take a new one) and customize it...
read more

How to install EF Tours for Girl Scouts POST on Windows?

Instruction on how to install EF Tours for Girl Scouts POST on Windows 7/8/10 Pc & Laptop

In this post, I am going to show you how to install EF Tours for Girl Scouts POST on Windows PC by using Android App Player such as BlueStacks, Nox, KOPlayer, ...

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Install EF Tours for Girl Scouts POST using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Google Play Store comes pre-installed in Bluestacks. On the home screen, find Google Play Store and click on the icon to open it. You may need to sign in to access the Play Store.
  3. Look for "EF Tours for Girl Scouts POST" in the search bar. Click to install "EF Tours for Girl Scouts POST" from the search results.
  4. If you don't see this app from the search results, you need to download APK/XAPK installer file from this page, save it to an easy-to-find location. Once the APK/XAPK file is downloaded, double-click to open it. You can also drag and drop the APK/XAPK file onto the BlueStacks home screen to open it.
  5. Once installed, click "EF Tours for Girl Scouts POST" icon on the home screen to start using, it'll work like a charm :D

[Notes] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to install EF Tours for Girl Scouts POST on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. After NoxPlayer is installed, open it and you can see the search bar on the home screen. Look for "EF Tours for Girl Scouts POST" and click to install from the search results.
  3. You can also download the APK/XAPK installer file from this page, then drag and drop it onto the NoxPlayer home screen. The installation process will take place quickly. After successful installation, you can find "EF Tours for Girl Scouts POST" on the home screen of NoxPlayer.

Discussion

(*) is required

Download older versions

Other versions available: 1.0.

Download EF Tours for Girl Scouts POST 1.0 on Windows PC – 8.9 MB

Required to be able to access the camera device.
Allows an application to write to external storage.
Allows an application to read from external storage.
Allows applications to open network sockets.
Allows read only access to phone state, including the phone number of the device, current cellular network information, the status of any ongoing calls, and a list of any PhoneAccounts registered on the device.
Allows using PowerManager WakeLocks to keep processor from sleeping or screen from dimming.
Allows applications to access information about networks.
Allows read only access to phone state, including the phone number of the device, current cellular network information, the status of any ongoing calls, and a list of any PhoneAccounts registered on the device.
Allows applications to access information about Wi-Fi networks.
Allows an app to access approximate location.
Allows an app to access precise location.