Home  /  Education Apps  / 必读 on Windows Pc

必读 on Windows Pc

Developed By: 微软移动联新互联网服务有限公司

License: Free

Rating: 4,0/5 - 55 votes

Last Updated: July 31, 2026

Download on Windows PC

Compatible with Windows 10/11 PC & Laptop

App Details

Version 1.2.0.20150105171149
Size 2.8 MB
Release Date January 07, 15
Category Education Apps

App Permissions:
Allows read only access to phone state, including the phone number of the device, current cellular network information, the status of any ongoing calls, and a list of any PhoneAccounts registered on the device. [see more (11)]

What's New:
1、优化文章本地缓存,节省更多流量2、优化网页打开交互 [see more]

Description from Developer:
Information in English is a must-read for reading and learning applications. The application by analyzing people care about international hot spots, events, not only can automatica... [read more]

App preview ([see all 5 screenshots])

App preview

About this app

On this page you can download 必读 and install on Windows PC. 必读 is free Education app, developed by 微软移动联新互联网服务有限公司. Latest version of 必读 is 1.2.0.20150105171149, was released on 2015-01-07 (updated on 2026-07-31). Estimated number of the downloads is more than 1,000. Overall rating of 必读 is 4,0. Generally most of the top apps on Android Store have rating of 4+. This app had been rated by 55 users, 7 users had rated it 5*, 31 users had rated it 1*.

How to install 必读 on Windows?

Instruction on how to install 必读 on Windows 10 Windows 11 PC & Laptop

In this post, I am going to show you how to install 必读 on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...

Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.

[Note] You can also download older versions of this app on bottom of this page.

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Install 必读 using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
  3. Once installed, click "必读" icon on the home screen to start using, it'll work like a charm :D

[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more

[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to install 必读 on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
  3. The installation process will take place quickly. After successful installation, you can find "必读" on the home screen of NoxPlayer, just click to open it.

Discussion

(*) is required

Download older versions

Other versions available: 1.2.0.20150105171149.

Download 必读 1.2.0.20150105171149 on Windows PC – 2.8 MB

Information in English is a must-read for reading and learning applications. The application by analyzing people care about international hot spots, events, not only can automatically aggregated and senior authoritative information overseas comments, while providing a reading assistant and words of this, to help you easily read English rapidly improve their English reading level.

Instant - Six Categories plus hotspots recommend covering the hottest, most popular international information;
Smooth read - Tap not know words, you can easily get online translation results;
Learning - Support American pronunciation of words, the words of the support;
Interactive - Share interesting information to the circle of friends;
1、优化文章本地缓存,节省更多流量
2、优化网页打开交互
Allows read only access to phone state, including the phone number of the device, current cellular network information, the status of any ongoing calls, and a list of any PhoneAccounts registered on the device.
Allows applications to open network sockets.
Allows applications to access information about networks.
Allows applications to access information about Wi-Fi networks.
Allows an application to write to external storage.
Allows mounting and unmounting file systems for removable storage.
Allows access to the vibrator.
Allows an app to access precise location.
Allows an application to install packages.
Allows an application to delete packages.
Allows an application to read from external storage.