Home  /  Business Apps  / meetingsystem on Windows Pc

meetingsystem on Windows Pc

Developed By: LATESTON

License: Free

Rating: 5,0/5 - 1 votes

Last Updated: July 31, 2026

Download on Windows PC

Compatible with Windows 10/11 PC & Laptop

App Details

Version 1.0.8
Size 3 MB
Release Date January 18, 15
Category Business Apps

App Permissions:
Allows applications to open network sockets. [see more (6)]

Description from Developer:
. Plan multiple meetings :
. Set the meeting details such as :Name, date, time ,status, goals ,deadlines ,etc.
· Receive reminder via email to attendees
·... [read more]

App preview ([see all 8 screenshots])

App preview

About this app

On this page you can download meetingsystem and install on Windows PC. meetingsystem is free Business app, developed by LATESTON. Latest version of meetingsystem is 1.0.8, was released on 2015-01-18 (updated on 2026-07-31). Estimated number of the downloads is more than 10. Overall rating of meetingsystem is 5,0. Generally most of the top apps on Android Store have rating of 4+. This app had been rated by 1 users, 1 users had rated it 5*, 1 users had rated it 1*.

How to install meetingsystem on Windows?

Instruction on how to install meetingsystem on Windows 10 Windows 11 PC & Laptop

In this post, I am going to show you how to install meetingsystem on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...

Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.

[Note] You can also download older versions of this app on bottom of this page.

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Install meetingsystem using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
  3. Once installed, click "meetingsystem" icon on the home screen to start using, it'll work like a charm :D

[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more

[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to install meetingsystem on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
  3. The installation process will take place quickly. After successful installation, you can find "meetingsystem" on the home screen of NoxPlayer, just click to open it.

Discussion

(*) is required

Download older versions

Other versions available: 1.0.8.

Download meetingsystem 1.0.8 on Windows PC – 3 MB

. Plan multiple meetings :
. Set the meeting details such as :Name, date, time ,status, goals ,deadlines ,etc.
· Receive reminder via email to attendees
· Receive reminder on the schedule of the device
· Set the attendees
Allows applications to open network sockets.
Allows applications to access information about networks.
Allows applications to access information about Wi-Fi networks.
Allows access to the list of accounts in the Accounts Service.
Allows using PowerManager WakeLocks to keep processor from sleeping or screen from dimming.
Allows an application to read the user's contacts data.