Home  /  Education Apps  / SINA on Windows Pc

SINA on Windows Pc

Developed By: SINA-CONAGUA

License: Free

Rating: 1,4/5 - 84 votes

Last Updated: August 01, 2026

Download on Windows PC

Compatible with Windows 10/11 PC & Laptop

App Details

Version 1.0.6
Size 34.7 MB
Release Date February 06, 19
Category Education Apps

App Permissions:
Allows applications to open network sockets. [see more (1)]

What's New:
Se agregó monitoreo de presas [see more]

Description from Developer:
The National Water Information System (SINA) is the institutional system of the National Water Commission (CONAGUA), by the General Department of Planning, through the Interagency... [read more]

App preview ([see all 8 screenshots])

App preview

About this app

On this page you can download SINA and install on Windows PC. SINA is free Education app, developed by SINA-CONAGUA. Latest version of SINA is 1.0.6, was released on 2019-02-06 (updated on 2026-08-01). Estimated number of the downloads is more than 5,000. Overall rating of SINA is 1,4. Generally most of the top apps on Android Store have rating of 4+. This app had been rated by 84 users, 6 users had rated it 5*, 74 users had rated it 1*.

How to install SINA on Windows?

Instruction on how to install SINA on Windows 10 Windows 11 PC & Laptop

In this post, I am going to show you how to install SINA on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...

Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.

[Note] You can also download older versions of this app on bottom of this page.

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Install SINA using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
  3. Once installed, click "SINA" icon on the home screen to start using, it'll work like a charm :D

[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more

[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to install SINA on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
  3. The installation process will take place quickly. After successful installation, you can find "SINA" on the home screen of NoxPlayer, just click to open it.

Discussion

(*) is required

Download older versions

Other versions available: 1.0.6.

Download SINA 1.0.6 on Windows PC – 34.7 MB

The National Water Information System (SINA) is the institutional system of the National Water Commission (CONAGUA), by the General Department of Planning, through the Interagency Coordination Management. SINA integrates and publishes statistical and geographical information in the water sector with information from different areas of CONAGUA and other institutions.
Se agregó monitoreo de presas
Allows applications to open network sockets.