Home  /  Trivia Games  / Find Slender Man Horror Puzzle on Windows Pc

Find Slender Man Horror Puzzle on Windows Pc

Developed By: Bigzur Games

License: Free

Rating: 3,5/5 - 1.484 votes

Last Updated: August 05, 2026

Download on Windows PC

Compatible with Windows 10/11 PC & Laptop

Game Details

Version 1.4
Size 15 MB
Release Date March 03, 14
Category Trivia Games

Game Permissions:
Allows applications to open network sockets. [see more (6)]

What's New:
Just released on Google Play [see more]

Description from Developer:
* Do you like solving mysteries and piecing puzzles together?
* Being afraid and laughing at the same time?
* Install "Find Slender" and join our friendly community of ho... [read more]

Game preview ([see all 16 screenshots])

Game preview

About this game

On this page you can download Find Slender Man Horror Puzzle and play on Windows PC. Find Slender Man Horror Puzzle is free Trivia game, developed by Bigzur Games. Latest version of Find Slender Man Horror Puzzle is 1.4, was released on 2014-03-03 (updated on 2026-08-05). Estimated number of the downloads is more than 50,000. Overall rating of Find Slender Man Horror Puzzle is 3,5. Generally most of the top apps on Android Store have rating of 4+. This game had been rated by 1,484 users, 373 users had rated it 5*, 703 users had rated it 1*.

How to play Find Slender Man Horror Puzzle on Windows?

Instruction on how to play Find Slender Man Horror Puzzle on Windows 10 Windows 11 PC & Laptop

In this post, I am going to show you how to install Find Slender Man Horror Puzzle on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...

Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.

[Note] You can also download older versions of this game on bottom of this page.

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Play Find Slender Man Horror Puzzle using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
  3. Once installed, click "Find Slender Man Horror Puzzle" icon on the home screen to start playing, it'll work like a charm :D

[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more

[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to play Find Slender Man Horror Puzzle on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
  3. The installation process will take place quickly. After successful installation, you can find "Find Slender Man Horror Puzzle" on the home screen of NoxPlayer, just click to open it.

Discussion

(*) is required

Download older versions

Other versions available: 1.4.

Download Find Slender Man Horror Puzzle 1.4 on Windows PC – 15 MB

* Do you like solving mysteries and piecing puzzles together?
* Being afraid and laughing at the same time?
* Install "Find Slender" and join our friendly community of horror and Slender man - lovers.

* In our "Find Slender" game you've got to pin the place on the photo where the Slender man is.
* Each photo has a certain time limit.
* The faster you find the Slender man, the more "fingerprints" you get.
* You can use hints or skip some puzzles outright.

* To get your own photos into the game you have to: Post your photo via Twitter or Instagram with the #SlenderManOrigins hashtag, and we will add it to the game.

* * * Join our horror community today! * * *

http://facebook.com/HorrorSlender
http://twitter.com/BestHorrorGames
Just released on Google Play
Allows applications to open network sockets.
Allows applications to access information about networks.
Allows applications to access information about Wi-Fi networks.
Allows an application to write to external storage.
Allows using PowerManager WakeLocks to keep processor from sleeping or screen from dimming.
Allows an application to read from external storage.