Home  /  Travel & Local Apps  / Abu Dhabi Travel Guide & Map on Windows Pc

Abu Dhabi Travel Guide & Map on Windows Pc

Developed By: Maps, GPS Navigation

License: Free

Rating: 4,0/5 - 15 votes

Last Updated: August 05, 2026

Download on Windows PC

Compatible with Windows 10/11 PC & Laptop

App Details

Version 2.3.34
Size 12.8 MB
Release Date August 01, 16
Category Travel & Local Apps

App Permissions:
Allows applications to open network sockets. [see more (10)]

What's New:
We're phasing out this app and this is the last update it is going to receive. Please download our new free app "Sygic Travel" with worldwide coverage. [see more]

Description from Developer:
Never miss the best sights on your trip again. Tripomatic allows you to pick attractions that you want to see and create a day-by-day itinerary for your journey. It is the best way... [read more]

App preview ([see all 15 screenshots])

App preview

About this app

On this page you can download Abu Dhabi Travel Guide & Map and install on Windows PC. Abu Dhabi Travel Guide & Map is free Travel & Local app, developed by Maps, GPS Navigation. Latest version of Abu Dhabi Travel Guide & Map is 2.3.34, was released on 2016-08-01 (updated on 2026-08-05). Estimated number of the downloads is more than 1,000. Overall rating of Abu Dhabi Travel Guide & Map is 4,0. Generally most of the top apps on Android Store have rating of 4+. This app had been rated by 15 users, 1 users had rated it 5*, 8 users had rated it 1*.

How to install Abu Dhabi Travel Guide & Map on Windows?

Instruction on how to install Abu Dhabi Travel Guide & Map on Windows 10 Windows 11 PC & Laptop

In this post, I am going to show you how to install Abu Dhabi Travel Guide & Map on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...

Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.

[Note] You can also download older versions of this app on bottom of this page.

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Install Abu Dhabi Travel Guide & Map using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
  3. Once installed, click "Abu Dhabi Travel Guide & Map" icon on the home screen to start using, it'll work like a charm :D

[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more

[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to install Abu Dhabi Travel Guide & Map on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
  3. The installation process will take place quickly. After successful installation, you can find "Abu Dhabi Travel Guide & Map" on the home screen of NoxPlayer, just click to open it.

Discussion

(*) is required

Download older versions

Other versions available: 2.3.34.

Download Abu Dhabi Travel Guide & Map 2.3.34 on Windows PC – 12.8 MB

Never miss the best sights on your trip again. Tripomatic allows you to pick attractions that you want to see and create a day-by-day itinerary for your journey. It is the best way to explore the places you have never visited before.


FEATURES
• Choose the best places to visit from our curated list of more than 100.000 attractions, covering 150+ countries - never miss out on the best sightseeing again
• Plan your travel itinerary in just a few minutes - spend your time on travel, not on planning
• Get weather forecast - what is the best day to schedule that river cruise for?
• Use time & distance estimates - is the way from the station to your hotel worth taking a taxi?
• Sync the itinerary across all your devices - you’ll always have your dream trip close at hand
• Find a hotel in your destination and save it to your itinerary - always find a way back to your hotel
• Enjoy detailed and walking-friendly maps - explore the city in the best way possible, on foot
• See subway lines on the map in popular cities - quickly get around town like a local
• Download offline maps and use the app offline (available as in-app purchase) - no more roaming fees
• Download and print out a PDF guide - don’t worry about battery power.


REVIEWERS SAY
• Guardian’s Android App of the Week
• Gizmodo’s App Deal of the Day
• Outside Magazine: The Best City Guide App for your Phone
• Also featured in BBC, The Telegraph, PC Magazine, TNW, ProductHunt and others


GET IN TOUCH WITH US
Check out our web planner: http://www.tripomatic.com
Follow us on Twitter: https://twitter.com/Tripomatic_com
Like us on Facebook: https://facebook.com/TripomaticCom
Contact our support team: team@tripomatic.com


To access 1000+ destinations worldwide, download the full-fledged Tripomatic app for free. Available at http://play.google.com/store/apps/details?id=com.tripomatic
We're phasing out this app and this is the last update it is going to receive. Please download our new free app "Sygic Travel" with worldwide coverage.
Allows applications to open network sockets.
Allows access to the list of accounts in the Accounts Service.
Allows an application to read from external storage.
Allows an application to write to external storage.
Allows an app to access approximate location.
Allows an app to access precise location.
Allows applications to access information about Wi-Fi networks.
Allows applications to access information about networks.
Allows access to the vibrator.
Allows read only access to phone state, including the phone number of the device, current cellular network information, the status of any ongoing calls, and a list of any PhoneAccounts registered on the device.