Home  /  Casual Games  / Beachball on Windows Pc

Beachball on Windows Pc

Developed By: devergence

License: Free

Rating: 3,6/5 - 59 votes

Last Updated: August 05, 2026

Download on Windows PC

Compatible with Windows 10/11 PC & Laptop

Game Details

Version 1.4
Size 6.9 MB
Release Date October 25, 13
Category Casual Games

Game Permissions:
Allows applications to open network sockets. [see more (2)]

What's New:
Errors fixed. [see more]

Description from Developer:
ENJOY PLAYING THE BETTER VOLLEYBALL GAME ALONE OR WITH YOUR FRIENDS USING ONLY ONE DEVICE.
BEACHBALL IS THE PERFECT CASUAL GAME FOR CHALLENGE YOUR FRIENDS AND DISCOVER WHO DOMINATE... [read more]

Game preview ([see all 8 screenshots])

Game preview

About this game

On this page you can download Beachball and play on Windows PC. Beachball is free Casual game, developed by devergence. Latest version of Beachball is 1.4, was released on 2013-10-25 (updated on 2026-08-05). Estimated number of the downloads is more than 10,000. Overall rating of Beachball is 3,6. Generally most of the top apps on Android Store have rating of 4+. This game had been rated by 59 users, 14 users had rated it 5*, 27 users had rated it 1*.

How to play Beachball on Windows?

Instruction on how to play Beachball on Windows 10 Windows 11 PC & Laptop

In this post, I am going to show you how to install Beachball on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...

Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.

[Note] You can also download older versions of this game on bottom of this page.

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Play Beachball using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
  3. Once installed, click "Beachball" icon on the home screen to start playing, it'll work like a charm :D

[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more

[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to play Beachball on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
  3. The installation process will take place quickly. After successful installation, you can find "Beachball" on the home screen of NoxPlayer, just click to open it.

Discussion

(*) is required

Download older versions

Other versions available: 1.4.

Download Beachball 1.4 on Windows PC – 6.9 MB

ENJOY PLAYING THE BETTER VOLLEYBALL GAME ALONE OR WITH YOUR FRIENDS USING ONLY ONE DEVICE.
BEACHBALL IS THE PERFECT CASUAL GAME FOR CHALLENGE YOUR FRIENDS AND DISCOVER WHO DOMINATES THE SCREEN!

In Beachball, you can play volleyball, tennis and other special zones like "Assault the castle" and the secret scenery.

Unlock new stages and balls for play on them in Arcade mode, CPU mode or play against another friend on the screen of your smartphone or tablet and discover who is the best in a game to 5 points for 2 players.

★ Compete against the machine over 6 difficulty levels in Arcade Mode
★ Unlock up to 4 scenarios.
★ Get the 4 balls in the game.
★ Challenge your friends to play against you in a single device (for 2 players).
★ For smartphones and tablets.
★ Discover the secret stage.
Errors fixed.
Allows applications to open network sockets.
Allows applications to access information about networks.