Home  /  Tools Apps  / Voice Screen Lock on Windows Pc

Voice Screen Lock on Windows Pc

Developed By: 2019 Best Apps Developers

License: Free

Rating: 1,0/5 - 1 votes

Last Updated: August 02, 2026

Download on Windows PC

Compatible with Windows 10/11 PC & Laptop

App Details

Version 1.0
Size 7.4 MB
Release Date January 29, 23
Category Tools Apps

App Permissions:
Allows applications to disable the keyguard if it is not secure. [see more (9)]

Description from Developer:
Speak something to unlock your phone. Speak voice command to unlock your phone.
Unlock with voice, fingerprint or recovery password
Unlock your phone screen with voice. Beautiful a... [read more]

App preview ([see all 11 screenshots])

App preview

About this app

On this page you can download Voice Screen Lock and install on Windows PC. Voice Screen Lock is free Tools app, developed by 2019 Best Apps Developers. Latest version of Voice Screen Lock is 1.0, was released on 2023-01-29 (updated on 2026-08-02). Estimated number of the downloads is more than 1,000. Overall rating of Voice Screen Lock is 1,0. Generally most of the top apps on Android Store have rating of 4+. This app had been rated by 1 users, 1 users had rated it 5*, 0 users had rated it 1*.

How to install Voice Screen Lock on Windows?

Instruction on how to install Voice Screen Lock on Windows 10 Windows 11 PC & Laptop

In this post, I am going to show you how to install Voice Screen Lock on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...

Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.

[Note] You can also download older versions of this app on bottom of this page.

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Install Voice Screen Lock using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
  3. Once installed, click "Voice Screen Lock" icon on the home screen to start using, it'll work like a charm :D

[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more

[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to install Voice Screen Lock on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
  3. The installation process will take place quickly. After successful installation, you can find "Voice Screen Lock" on the home screen of NoxPlayer, just click to open it.

Discussion

(*) is required

Download older versions

Other versions available: 1.0.

Download Voice Screen Lock 1.0 on Windows PC – 7.4 MB

Speak something to unlock your phone. Speak voice command to unlock your phone.
Unlock with voice, fingerprint or recovery password
Unlock your phone screen with voice. Beautiful and customizable Voice lock screen for any android device. Set a voice password and use it to unlock your device.

Alternative way for unlocking is also available when you can't say your un locker code public..

You use different lock screen with different pattern through secure your data or private or sensitive data.
Voice Lock Screen is built on speech recognition, if speech recognition service is not available on your phone, Voice Lock Screen will guide you to download Google app first, which offers exceptional speech recognition service.

Internet connection or offline speech recognition is required to use Voice Lock Screen.

Please download Voice Lock Screen and unlock with voice.

Mobile security is very important for all. Normally different apps are provide to secure mobile devices from being accessed by someone else, Some require codes and some require pattern to unlock or lock mobiles. but this is too old and now mobiles are also lock or unlock by your voice command.

You use different lock screen to secure your private data but if you want totally different lock screen which is work with your voice. So this application is for you. this Voice Screen Lock works on with your voice commands which makes your phone unique from others.

Voice Screen Lock through you gets totally new style lock screen just you speak your password and open your lock, you can change your password easily. This lock screen is only open using your voice no one can open this lock screen. If you bored using a traditional Lock screen to Lock & Unlock your phone then Use a new approach to Lock/Unlock your smartphone using your Voice.

THANK YOU!!!
Allows applications to disable the keyguard if it is not secure.
Allows using PowerManager WakeLocks to keep processor from sleeping or screen from dimming.
Allows an application to receive the ACTION_BOOT_COMPLETED that is broadcast after the system finishes booting.
Allows read only access to phone state, including the phone number of the device, current cellular network information, the status of any ongoing calls, and a list of any PhoneAccounts registered on the device.
Allows access to the vibrator.
Allows an app to create windows using the type TYPE_APPLICATION_OVERLAY, shown on top of all other apps.
Allows applications to open network sockets.
Allows applications to access information about networks.
Allows applications to access information about Wi-Fi networks.