Home  /  Entertainment Apps  / Ultimate Halloween Soundboard on Windows Pc

Ultimate Halloween Soundboard on Windows Pc

Developed By: Regieg Softworks

License: Free

Rating: 3,0/5 - 10 votes

Last Updated: July 31, 2026

Download on Windows PC

Compatible with Windows 10/11 PC & Laptop

App Details

Version 1.1
Size 11.1 MB
Release Date January 22, 23
Category Entertainment Apps

App Permissions:
Allows using PowerManager WakeLocks to keep processor from sleeping or screen from dimming. [see more (7)]

Description from Developer:
Just in time for Halloween comes the Ultimate Halloween Soundboard from Regieg Softworks. This app is full of screams, evil laughs, wolf howls, and many more spooky and scary sound... [read more]

App preview ([see all 4 screenshots])

App preview

About this app

On this page you can download Ultimate Halloween Soundboard and install on Windows PC. Ultimate Halloween Soundboard is free Entertainment app, developed by Regieg Softworks. Latest version of Ultimate Halloween Soundboard is 1.1, was released on 2023-01-22 (updated on 2026-07-31). Estimated number of the downloads is more than 1,000. Overall rating of Ultimate Halloween Soundboard is 3,0. Generally most of the top apps on Android Store have rating of 4+. This app had been rated by 10 users, 3 users had rated it 5*, 3 users had rated it 1*.

How to install Ultimate Halloween Soundboard on Windows?

Instruction on how to install Ultimate Halloween Soundboard on Windows 10 Windows 11 PC & Laptop

In this post, I am going to show you how to install Ultimate Halloween Soundboard on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...

Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.

[Note] You can also download older versions of this app on bottom of this page.

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Install Ultimate Halloween Soundboard using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
  3. Once installed, click "Ultimate Halloween Soundboard" icon on the home screen to start using, it'll work like a charm :D

[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more

[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to install Ultimate Halloween Soundboard on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
  3. The installation process will take place quickly. After successful installation, you can find "Ultimate Halloween Soundboard" on the home screen of NoxPlayer, just click to open it.

Discussion

(*) is required

Download older versions

Other versions available: 1.1.

Download Ultimate Halloween Soundboard 1.1 on Windows PC – 11.1 MB

Just in time for Halloween comes the Ultimate Halloween Soundboard from Regieg Softworks. This app is full of screams, evil laughs, wolf howls, and many more spooky and scary sounds. Over 45 sounds in total. The largest Halloween soundboard on Google Play.

Sounds can be set as ringtones, notifications, or alarms by simply pressing and holding on the sound that you would like to save.

If there are any sounds that you would like to see added to this app please leave a comment and I will try to accommodate you.
Allows using PowerManager WakeLocks to keep processor from sleeping or screen from dimming.
Allows an application to write to external storage.
Allows an application to read or write the system settings.
Allows applications to open network sockets.
Allows applications to access information about networks.
Allows applications to access information about Wi-Fi networks.
Allows an application to read from external storage.