Home  /  Tools Apps  / Security - Data on Windows Pc

Security - Data on Windows Pc

Developed By: UNIAJC

License: Free

Rating: 4,9/5 - 7 votes

Last Updated: July 31, 2026

Download on Windows PC

Compatible with Windows 10/11 PC & Laptop

App Details

Version 1.0
Size 10 MB
Release Date December 09, 14
Category Tools Apps

App Permissions:
Allows applications to open network sockets. [see more (5)]

Description from Developer:
This application was designed to encrypt and decrypt files. Only the person who installs the app, is able to see and handle the encrypted files.
Furthermore, it has permission wit... [read more]

App preview ([see all 22 screenshots])

App preview

About this app

On this page you can download Security - Data and install on Windows PC. Security - Data is free Tools app, developed by UNIAJC. Latest version of Security - Data is 1.0, was released on 2014-12-09 (updated on 2026-07-31). Estimated number of the downloads is more than 100. Overall rating of Security - Data is 4,9. Generally most of the top apps on Android Store have rating of 4+. This app had been rated by 7 users, 1 users had rated it 5*, 6 users had rated it 1*.

How to install Security - Data on Windows?

Instruction on how to install Security - Data on Windows 10 Windows 11 PC & Laptop

In this post, I am going to show you how to install Security - Data on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...

Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.

[Note] You can also download older versions of this app on bottom of this page.

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Install Security - Data using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
  3. Once installed, click "Security - Data" icon on the home screen to start using, it'll work like a charm :D

[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more

[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to install Security - Data on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
  3. The installation process will take place quickly. After successful installation, you can find "Security - Data" on the home screen of NoxPlayer, just click to open it.

Discussion

(*) is required

Download older versions

Other versions available: 1.0.

Download Security - Data 1.0 on Windows PC – 10 MB

This application was designed to encrypt and decrypt files. Only the person who installs the app, is able to see and handle the encrypted files.
Furthermore, it has permission with Dropbox cloud, in case you want to upload or download your encrypted files. It was developed with the goal that just one device is able to decrypt its encrypted files, so, thinking in portability at this situation, the app has the function to export and import the encryption key, if you need to restore them in another device with Security Data.
Allows applications to open network sockets.
Allows applications to access information about networks.
Allows an application to read from external storage.
Allows an application to write to external storage.
Allows using PowerManager WakeLocks to keep processor from sleeping or screen from dimming.