GoGo Tap Fighter: Beat Up Fist on Windows Pc
Developed By: Funworks Studio Co. Ltd.
License: Free
Rating: 3,8/5 - 53 votes
Last Updated: August 05, 2026
Game Details
| Version |
1.1.2 |
| Size |
8.8 MB |
| Release Date |
July 13, 16 |
| Category |
Casual Games |
|
Game Permissions: Allows applications to open network sockets. [see more (7)]
|
|
What's New: Minor Bug Fixed [see more]
|
|
Description from Developer: Go Fury ! Become The Iron Fist king Fighter ! Revenge all villains & Beat Up The Boss !
Yes, you are now a legendary little street fighter , use your iron fist and revenge all... [read more]
|
About this game
On this page you can download GoGo Tap Fighter: Beat Up Fist and play on Windows PC. GoGo Tap Fighter: Beat Up Fist is free Casual game, developed by Funworks Studio Co. Ltd.. Latest version of GoGo Tap Fighter: Beat Up Fist is 1.1.2, was released on 2016-07-13 (updated on 2026-08-05). Estimated number of the downloads is more than 5,000. Overall rating of GoGo Tap Fighter: Beat Up Fist is 3,8. Generally most of the top apps on Android Store have rating of 4+. This game had been rated by 53 users, 8 users had rated it 5*, 29 users had rated it 1*.
How to play GoGo Tap Fighter: Beat Up Fist on Windows?
Instruction on how to play GoGo Tap Fighter: Beat Up Fist on Windows 10 Windows 11 PC & Laptop
In this post, I am going to show you how to install GoGo Tap Fighter: Beat Up Fist on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...
Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.
[Note] You can also download older versions of this game on bottom of this page.
Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.
If this doesn't work on your PC, or you cannot install, comment here and we will help you!
Step By Step Guide To Play GoGo Tap Fighter: Beat Up Fist using BlueStacks
- Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
- Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
- Once installed, click "GoGo Tap Fighter: Beat Up Fist" icon on the home screen to start playing, it'll work like a charm :D
[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more
[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.
How to play GoGo Tap Fighter: Beat Up Fist on Windows PC using NoxPlayer
- Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
- Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
- The installation process will take place quickly. After successful installation, you can find "GoGo Tap Fighter: Beat Up Fist" on the home screen of NoxPlayer, just click to open it.
Discussion
(*) is required
Go Fury ! Become The Iron Fist king Fighter ! Revenge all villains & Beat Up The Boss !
Yes, you are now a legendary little street fighter , use your iron fist and revenge all villains & the boss !
Gogo Hurry up, brofist ! Go outside and beat up villains and revenge their boss using your fury iron fist punch
in order to complete this exciting fast tap tap revenge mission !
Aside from the “Normal Mode”, this game also has another awesome mode, the “Danger Mode”.
In this mode, the view of iron fist fighter becomes smaller and view less visible, therefore the big chances of failing increases .
--- How to play ---
To control your legendary litttle street fighter , use the “Move” button to walking towards your enemies,
use the “Attack” button to strike hit . You need to be quick on the trigger. Be careful not to tap the wrong button, or else…
Our legendary street little king of fighter ! Using your top speed and fury iron fist ,
challenge both game modes and get a best high scores in this 8 bit awesome fighting game !
Gogo Hurry up, brofist ! Our legendary street puncher ! The big boss is waiting for you ! Use your fury iron fist !
Become the great little king of fighter on this awesome " GoGo Tap Fighter: Beat Up Fist " now !
-------------------------------------------------------------------------------------------------------------
Go Fury ! Become The Iron Fist king Fighter ! Revenge all villains & Beat Up The Boss !
Yes, you are now a legendary little street fighter , use your iron fist and revenge all villains & the boss !
Gogo Hurry up, brofist ! Go outside and beat up villains and revenge their boss using your fury iron fist punch
in order to complete this exciting fast tap tap revenge mission !
Aside from the “Normal Mode”, this game also has another awesome mode, the “Danger Mode”.
In this mode, the view of iron fist fighter becomes smaller and view less visible, therefore the big chances of failing increases .
--- How to play ---
To control your legendary litttle street fighter , use the “Move” button to walking towards your enemies,
use the “Attack” button to strike hit . You need to be quick on the trigger. Be careful not to tap the wrong button, or else…
Our legendary street little king of fighter ! Using your top speed and fury iron fist ,
challenge both game modes and get a best high scores in this 8 bit awesome fighting game !
Gogo Hurry up, brofist ! Our legendary street puncher ! The big boss is waiting for you ! Use your fury iron fist !
Become the great little king of fighter on this awesome " GoGo Tap Fighter: Beat Up Fist " now !
-------------------------------------------------------------------------------------------------------------
Go Fury ! Become The Iron Fist king Fighter ! Revenge all villains & Beat Up The Boss !
Yes, you are now a legendary little street fighter , use your iron fist and revenge all villains & the boss !
Gogo Hurry up, brofist ! Go outside and beat up villains and revenge their boss using your fury iron fist punch
in order to complete this exciting fast tap tap revenge mission !
Aside from the “Normal Mode”, this game also has another awesome mode, the “Danger Mode”.
In this mode, the view of iron fist fighter becomes smaller and view less visible, therefore the big chances of failing increases .
--- How to play ---
To control your legendary litttle street fighter , use the “Move” button to walking towards your enemies,
use the “Attack” button to strike hit . You need to be quick on the trigger. Be careful not to tap the wrong button, or else…
Our legendary street little king of fighter ! Using your top speed and fury iron fist ,
challenge both game modes and get a best high scores in this 8 bit awesome fighting game !
Gogo Hurry up, brofist ! Our legendary street puncher ! The big boss is waiting for you ! Use your fury iron fist !
Become the great little king of fighter on this awesome " GoGo Tap Fighter: Beat Up Fist " now !
Minor Bug Fixed
Allows applications to open network sockets.
Allows read only access to phone state, including the phone number of the device, current cellular network information, the status of any ongoing calls, and a list of any PhoneAccounts registered on the device.
Allows applications to access information about Wi-Fi networks.
Allows applications to access information about networks.
Allows access to the vibrator.
Allows an application to write to external storage.
Allows an application to read from external storage.