Home  /  Tools Apps  / TV Link on Windows Pc

TV Link on Windows Pc

Developed By: cDev Software

License: Free

Rating: 3,3/5 - 1.931 votes

Last Updated: August 05, 2026

Download on Windows PC

Compatible with Windows 10/11 PC & Laptop

App Details

Version 1.1.91
Size 7 MB
Release Date March 12, 17
Category Tools Apps

App Permissions:
Allows an application to write to external storage. [see more (10)]

What's New:
-Various bug fixes-Improvements to queuing [see more]

Description from Developer:
Control your Samsung Smart TV like never before with TV Link!

TV Link allows you to control your Samsung Smart TV / Smart Bluray player from your smartphone or tablet by
using th... [read more]

App preview ([see all 10 screenshots])

App preview

About this app

On this page you can download TV Link and install on Windows PC. TV Link is free Tools app, developed by cDev Software. Latest version of TV Link is 1.1.91, was released on 2017-03-12 (updated on 2026-08-05). Estimated number of the downloads is more than 100,000. Overall rating of TV Link is 3,3. Generally most of the top apps on Android Store have rating of 4+. This app had been rated by 1,931 users, 804 users had rated it 5*, 593 users had rated it 1*.

How to install TV Link on Windows?

Instruction on how to install TV Link on Windows 10 Windows 11 PC & Laptop

In this post, I am going to show you how to install TV Link on Windows PC by using Android App Player such as BlueStacks, LDPlayer, Nox, KOPlayer, ...

Before you start, you will need to download the APK/XAPK installer file, you can find download button on top of this page. Save it to easy-to-find location.

[Note] You can also download older versions of this app on bottom of this page.

Below you will find a detailed step-by-step guide, but I want to give you a fast overview of how it works. All you need is an emulator that will emulate an Android device on your Windows PC and then you can install applications and use it - you see you're playing it on Android, but this runs not on a smartphone or tablet, it runs on a PC.

If this doesn't work on your PC, or you cannot install, comment here and we will help you!

Step By Step Guide To Install TV Link using BlueStacks

  1. Download and Install BlueStacks at: https://www.bluestacks.com. The installation procedure is quite simple. After successful installation, open the Bluestacks emulator. It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  2. Open the APK/XAPK file: Double-click the APK/XAPK file to launch BlueStacks and install the application. If your APK/XAPK file doesn't automatically open BlueStacks, right-click on it and select Open with... Browse to the BlueStacks. You can also drag-and-drop the APK/XAPK file onto the BlueStacks home screen
  3. Once installed, click "TV Link" icon on the home screen to start using, it'll work like a charm :D

[Note 1] For better performance and compatibility, choose BlueStacks 5 Nougat 64-bit read more

[Note 2] about Bluetooth: At the moment, support for Bluetooth is not available on BlueStacks. Hence, apps that require control of Bluetooth may not work on BlueStacks.

How to install TV Link on Windows PC using NoxPlayer

  1. Download & Install NoxPlayer at: https://www.bignox.com. The installation is easy to carry out.
  2. Drag the APK/XAPK file to the NoxPlayer interface and drop it to install
  3. The installation process will take place quickly. After successful installation, you can find "TV Link" on the home screen of NoxPlayer, just click to open it.

Discussion

(*) is required

Download older versions

Other versions available: 1.1.91 , 1.1.8.

Download TV Link 1.1.91 on Windows PC – 7 MB

Download TV Link 1.1.8 on Windows PC – 7 MB

Control your Samsung Smart TV like never before with TV Link!

TV Link allows you to control your Samsung Smart TV / Smart Bluray player from your smartphone or tablet by
using the corresponding TV Link app available on the Samsung Smart Hub. Please install and run the
TV Link app on your Smart TV / Bluray player before connecting with the android client.

Whether viewing live TV listings, listing and playing content from your USB connected devices, streaming media from local network devices, or playing video from YouTube, TV Link offers a feature rich and efficient means to control your Smart TV.

Features:

- View TV listings and control TV functions
- Cloud streaming from Dropbox and OneDrive
- Stream Video, Audio, and Music from your device to your TV
- Browse and play media from USB devices connected to your TV
- Search for and play videos from YouTube and Vimeo
- Browse and play media from local network sources (DLNA)
- See the world with Google Maps and Street View
- Create and play Slideshows
- Stream pictures from your devices camera to the TV

For current and future device support information, support enquiries,
and an app permissions break down please visit http://www.cdevsoftware.com/
-Various bug fixes
-Improvements to queuing
Allows an application to write to external storage.
Allows applications to open network sockets.
Allows applications to access information about Wi-Fi networks.
Allows applications to enter Wi-Fi Multicast mode.
Allows applications to access information about networks.
Required to be able to access the camera device.
Allows access to the list of accounts in the Accounts Service.
Allows access to the vibrator.
Allows using PowerManager WakeLocks to keep processor from sleeping or screen from dimming.
Allows an application to read from external storage.